Размер:
AAA
Цвет: CCC
Изображения: Вкл.Выкл.
Обычная версия сайта

Archive

The editorial board of the "MSTU Vestnik" journal supports the «Open Access» policy which enables users to have free and unlimited access to scientific articles (to read, download, copy, distribute) in case the author is indicated when further quoted.

The academic periodical "Vestnik of MSTU" is available under the license Creative Commons «Attribution» (Attribution) 3.0 Unported (CC BY 3.0).


Warning: file_get_contents(http://doi.crossref.org/servlet/getForwardLinks?usr=murmansk&pwd=4_mstu&doi=): failed to open stream: HTTP request failed! HTTP/1.1 400 Bad Request in /var/www/old/sites/vestnik/php/find_ref.php on line 2

PDFRead

Abstract. The paper describes results of technical-and-economical comparison of some transportation system options for apatite-nepheline haulage from the Partomchorr deposit to the "Oleni Ruchei" processing plant. The reasonable mining-and-transportation system considering mining-and-geological characteristic of the area has been introduced.

Keywords: deposit, mining-and-transport system, tunnel, railway, conveyer, electric locomotive, capital expenses, operating expenses, producing costs

Printed reference: // Vestnik of MSTU. 2011. V. 14, No 4. P. 784-788.

Electronic reference: // Vestnik of MSTU. 2011. V. 14, No 4. P. 784-788. URL: http://vestnik.mstu.edu.ru/v14_4_n46/articles/784_788_gromov.pdf.

(In Russian, p.5, fig. 2, tables 1, ref 7, Adobe PDF)