Размер:
AAA
Цвет: CCC
Изображения: Вкл.Выкл.
Обычная версия сайта

Archive

The editorial board of the "MSTU Vestnik" journal supports the «Open Access» policy which enables users to have free and unlimited access to scientific articles (to read, download, copy, distribute) in case the author is indicated when further quoted.

The academic periodical "Vestnik of MSTU" is available under the license Creative Commons «Attribution» (Attribution) 3.0 Unported (CC BY 3.0).


Warning: file_get_contents(http://doi.crossref.org/servlet/getForwardLinks?usr=murmansk&pwd=4_mstu&doi=): failed to open stream: HTTP request failed! HTTP/1.1 400 Bad Request in /var/www/old/sites/vestnik/php/find_ref.php on line 2

Madatov A.G., Sereda A.-V.I.

The pre-drill and real time while drilling overpressure prediction based on Effective Basin Model concept

PDFRead

Abstract. The problem of the pre-drill predictability of an overpressure phenomenon has been considered within the range of the Effective Basin Model concept. The inherent and numerical origins of the relevant prediction scenarios have been analysed. The solutions of numerical problems are attached in the form of the appendixes. The approach to the stabilisation of an inherent prediction error has been proposed. The real time correction of a pre-drill prediction in during drilling ("Look Ahead") mode has been considered in the context of the re-calibration or/and adjustment of a prediction model and a framework earth model respectively. The re-calibration problem has been introduced as an extension of the single-well data inversion problem. The corresponding ill-posed task has been formulated and the approach to getting its locally unique solution has been discussed. The relevant computer algorithm has been described in details. The applicability of the new approach and solution to the real time drilling conditions have been tested based on the speculative (North Sea area) and real data (Gulf of Mexico) examples. These tests confirm high converging speed of the updating routine and flexibility of the algorithm. The achieved results correspond to higher accuracy in comparison with available standard methods.

Printed reference: Madatov A.G., Sereda A.-V.I. The pre-drill and real time while drilling overpressure prediction based on Effective Basin Model concept // Vestnik of MSTU. 2006. V. 9, No 3. P. -.

Electronic reference: Madatov A.G., Sereda A.-V.I. The pre-drill and real time while drilling overpressure prediction based on Effective Basin Model concept // Vestnik of MSTU. 2006. V. 9, No 3. P. -. URL: http://vestnik.mstu.edu.ru/v09_3_n23/articles/01_sereda.pdf.

(In English, p.28, fig. 8, tables 3, ref 52, Adobe PDF)